Jay Ambe Scrap
This 60 kW solar installation at Jay Ambe Scrap helps power daily operations while promoting eco-friendly practices, reducing grid dependency, and delivering significant energy cost savings.
Project Goals
The primary goal of this project was to reduce the company’s dependency on conventional electricity sources and significantly cut down on rising energy costs. By adopting solar, Jay Ambe Scrap aimed to improve operational efficiency, promote green practices in their recycling operations, and contribute to a cleaner, more sustainable future.

Project Capacity
60 kW

Electricity Produced Annually (kWh)
83,520 kWh

Offsetting
83.52 Tonnes

Savings Annually in Rs.
10,23,120 Rs


Challenge
• Custom Panel Arrangement: Irregular rooftop structure required a custom panel arrangement to ensure uniform solar exposure.
• Shading Challenges: Industrial equipment created partial shading, impacting ideal panel placement and performance.
• Limited Installation Window: Operation-heavy schedule limited daytime availability for installation and electrical integration work.
• Shading Challenges: Industrial equipment created partial shading, impacting ideal panel placement and performance.
• Limited Installation Window: Operation-heavy schedule limited daytime availability for installation and electrical integration work.
Solution
• Tailored Panel Layout: Engineered a tailored solar panel layout considering structure shape and sunlight optimization.
• Advanced Shading Solutions: Used advanced string inverters to counter effects of partial shading and optimize energy output.
• Zero-Disruption Execution: Executed installation in off-peak hours ensuring zero disruption to routine operations or site safety.
• Advanced Shading Solutions: Used advanced string inverters to counter effects of partial shading and optimize energy output.
• Zero-Disruption Execution: Executed installation in off-peak hours ensuring zero disruption to routine operations or site safety.
Challenge
• Custom Panel Arrangement: Irregular rooftop structure required a custom panel arrangement to ensure uniform solar exposure.
• Shading Challenges: Industrial equipment created partial shading, impacting ideal panel placement and performance.
• Limited Installation Window: Operation-heavy schedule limited daytime availability for installation and electrical integration work.
• Shading Challenges: Industrial equipment created partial shading, impacting ideal panel placement and performance.
• Limited Installation Window: Operation-heavy schedule limited daytime availability for installation and electrical integration work.
Solution
• Tailored Panel Layout: Engineered a tailored solar panel layout considering structure shape and sunlight optimization.
• Advanced Shading Solutions: Used advanced string inverters to counter effects of partial shading and optimize energy output.
• Zero-Disruption Execution: Executed installation in off-peak hours ensuring zero disruption to routine operations or site safety.
• Advanced Shading Solutions: Used advanced string inverters to counter effects of partial shading and optimize energy output.
• Zero-Disruption Execution: Executed installation in off-peak hours ensuring zero disruption to routine operations or site safety.